Notable case, Giacimenti petroliferi del Kuwait settentrionale e sud-orientale, Kuwait

Kuwait oil lakes

The desert around Kuwait's oil fields, where retreating Iraqi troops set fire to and sabotaged hundreds of wells in 1991. The unburned crude formed about 300 oil lakes; 26 million m³ of soil are now the subject of a clean-up programme that includes bioremediation.

Microbial bioremediation

At a glance

Activity
1991–1991
Media
soil, air
Kind of site
oil, military, accident
  1. Area. The sources read disagree: Lamor (2023) gives 114 km² for the area covered by the KERP programme, the Wikipedia entry about 300 km² (114 square miles). The volume of soil to be treated is 26 million m³ (Lamor, 2023).

Contaminants

Status

Remediation under way

Remediation is under way. By April 2024, 2.3 million tons of soil had been treated; new contracts worth 1.7 billion dollars were signed in late 2023 (figures as given by Wikipedia, read in 2026).

Story

In January and February 1991, at the end of the Gulf War, retreating Iraqi forces set fire to between 605 and 732 Kuwaiti oil wells. The fires burned for months: the first were put out in early April, and the last well was capped on 6 November 1991. At the peak, 4–6 million barrels of crude were burning each day.

The oil that did not burn, estimated at 25–50 million barrels, collected in desert depressions and formed about 300 lakes. Soot and oil droplets fell on the sand and hardened into a crust ("tarcrete") covering nearly 5% of the country's land. The Wikipedia entry puts the contaminated sand and earth at about 40 million tons.

Clean-up began much later, under the Kuwait Environmental Remediation Program run by the Kuwait Oil Company and funded with about 3 billion dollars of UN compensation money. Bidding opened in 2017 and the contracts for the southern zones date from 2021. Less contaminated soils are treated by bioremediation, more heavily contaminated ones by soil washing. The programme also covers mine clearance and revegetation: the target stated in September 2024 is to plant 8 million shrubs, grasses and trees.

Timeline

  1. 1991January–February: between 605 and 732 wells set on fire. 6 November: the last well is capped.
  2. 2017May: bidding opens for the KERP works.
  3. 2018April: Worley is awarded the programme management contract.
  4. 2021December: remediation contracts awarded for the South Kuwait zones.
  5. 2023New soil rehabilitation contracts worth 1.7 billion dollars are signed.
  6. 2024By April, 2.3 million tons of soil have been treated.

Remediation

  1. 1991well cappingExtinguishing and capping of the burning wells, completed on 6 November 1991.
  2. 2021soil washingWashing of the more heavily contaminated soils under the KERP programme.
  3. 2023revegetationRevegetation contract drafted in 2023; target of 8 million plants stated in 2024.

Plants and fungi at this site

Microbial bioremediationField scale

Bioremediation trials on contaminated desert soil run by the Kuwait Institute for Scientific Research in the 1990s, published by Balba and colleagues in 1998. Only the title and citation of this paper were verified: methods and results need to be read in the full text.

From the literature

Species that acted on one of this site's contaminants in at least one study. The list is automatic and takes no account of this site's soil, concentrations or climate.

Plants

Fungi

The rest are on the contaminant pages.

Nearby

Sources

  1. Restoring Kuwait's soil by cleaning up world's biggest anthropogenic oil spill, Lamor, 2023
  2. Kuwaiti oil fires, Wikipedia, 2026
  3. Kuwait Environmental Remediation Program, Wikipedia, 2026