Notable case, Kabwe, Central Province, Zambia

Kabwe lead mine

A lead and zinc mine and smelter that worked from 1904 to 1994 in central Zambia. Dust from its waste dumps contaminated the neighbouring townships: in 2014 the mean blood lead level of 196 children was 48.3 µg/dL, almost ten times the US CDC reference value.

At a glance

Activity
1904–1994
People affected
76,000 (2019)1
Media
soil, air
Kind of site
mining, smelter
  1. People affected. Residents of the four worst-affected townships (Chowa, Kasanda, Makandanyama, Makululu) according to Human Rights Watch, including about 39,000 children. Wikipedia reports wider estimates of over 100,000 people.

Contaminants

Status

Not addressed

No comprehensive clean-up. As of August 2019, according to Human Rights Watch, the World Bank's ZMERIP project (launched in December 2016) had not yet started remediation, testing or treatment; artisanal mining continues on the mine's waste dumps, and since 2021 a company has held a licence to reprocess the tailings.

Story

The Broken Hill mine at Kabwe started work in 1904 under the Rhodesian Broken Hill Development Company; Anglo American controlled it for much of the twentieth century, until the Zambian state nationalised the sector in the 1970s. By the time it closed in 1994 it had produced 0.8 million tonnes of lead and 1.8 million of zinc, together with vanadium, silver and cadmium. The smelter and the tailings dumps were left next to the workers' townships with no containment.

Between 2003 and 2011 the World Bank's Copperbelt Environment Project had grass planted in the yards of 3,100 households and in schools, replaced topsoil, cleaned a canal and built 11 parks; between 2007 and 2010 about 5,000 children were tested and about 2,800 treated. The grass needed expensive watering, the imported soil eroded, and the target of bringing children's median blood lead down to 25 µg/dL was not met.

In 2014 Pure Earth measured a geometric mean of 1,470 mg/kg of lead in soils, with peaks of 62,142 mg/kg. In 2015 environmental groups paid for soil replacement at about 120 of the most contaminated homes. In 2016 the World Bank approved a second project, ZMERIP. A class action against Anglo American has been under way in South Africa since October 2020.

Timeline

  1. 1904Mining begins at Broken Hill (Kabwe).
  2. 1994The mine closes.
  3. 2003The World Bank's Copperbelt Environment Project starts (until 2011).
  4. 2014Pure Earth sampling: geometric mean of 1,470 mg/kg of lead in soils.
  5. 2016December: the World Bank's ZMERIP project is launched.
  6. 2019Human Rights Watch report: no remediation or treatment yet started under ZMERIP.
  7. 2020October: class action against Anglo American filed in South Africa.

Health

In 2014 Pure Earth found a mean blood lead level of 48.3 µg/dL in 196 children aged 2 to 8; in a 2012 study eight children exceeded 150 µg/dL. According to a 2018 estimate cited by Human Rights Watch, more than 95% of children in the nearby townships had elevated levels and about half needed medical treatment. Hospitals had no chelation medicine and testing stopped in 2016 when the kits ran out.

Remediation

  1. 2003grass cover and topsoil replacementGrass planted in 3,100 yards and in schools, topsoil replaced, a canal cleaned and 11 parks built (Copperbelt Environment Project, 2003–2011). The measures did not last.
  2. 2007blood testing and chelationAbout 5,000 children tested and about 2,800 treated (2007–2010).
  3. 2015soil replacementSoil removed and replaced at about 120 homes, funded by environmental groups.

From the literature

Species that acted on one of this site's contaminants in at least one study. The list is automatic and takes no account of this site's soil, concentrations or climate.

Plants

Fungi

The rest are on the contaminant pages.

Nearby

Sources

  1. "We Have to Be Worried": The Impact of Lead Contamination on Children's Rights in Kabwe, Zambia, Human Rights Watch, 2019
  2. Kabwe mine, Wikipedia, 2026