Notable case, Batchelor, Northern Territory, Australia
Rum Jungle uranium-copper mine
Unrungkoolpum
Rum Jungle, south of Darwin, supplied uranium to the British and US atomic programme from 1954 and was abandoned in 1971. Sulphides in the waste dumps, exposed to tropical rain, produce acid drainage laden with copper, zinc and manganese into the Finniss River; the 1980s rehabilitation is a case study cited both for its benefits and for its limits.
Contaminants
Status
Contained
The site was rehabilitated in 1983–1986 with clay and soil covers on the dumps. Mudd and Patterson (2010) conclude that the work failed the test of two decades: the covers underperformed and polluted groundwater had been left out of the project. The present state of a new rehabilitation plan was not verified against official sources.
Story
The deposit was found in 1949. The Australian government funded the mine and treatment plant to supply uranium oxide concentrate to the UK-US Combined Development Agency under a contract running from 1953 to 1962; the official opening was on 17 September 1954. The Commonwealth owned it through the Australian Atomic Energy Commission, and Territory Enterprises, a Rio Tinto group subsidiary, ran it. According to Wikipedia it produced 3,530 tonnes of uranium oxide and 20,000 tonnes of copper concentrate, from 863,000 tonnes of ore processed in all.
When it closed in April 1971 the site was left as it stood. The mineralisation is pyritic and about 1,500 mm of rain falls each year: the sulphides oxidise and release acid and metals into the East Branch of the Finniss. In 1974 fish communities in the affected reach were less diverse and less abundant than in unexposed reaches, and extensive fish kills were seen at the start of the wet season (Jeffree et al. 2001).
After a first attempt in 1977, a Commonwealth programme costing 16.2 million Australian dollars began in 1983: the dumps were reshaped and covered with clay and soil to reduce infiltration. Temperature measurements in one dump showed that pyrite oxidation had been greatly reduced or stopped (Harries and Ritchie 1987), and annual loads of sulphate, copper, zinc and manganese in the river fell by factors of 3–7, with fish communities recovering (Jeffree et al. 2001). A 2003 government survey, cited by Wikipedia, nevertheless found that the covers, designed to last at least a hundred years, had failed in under twenty.
Timeline
- 1949The uranium deposit is discovered.
- 195417 September: the mine is officially opened.
- 1971April: closure; the site is abandoned without rehabilitation.
- 1983The Commonwealth rehabilitation programme begins (A$16.2 million).
- 1990Supplementary A$1.8 million programme for the Rum Jungle Creek South dumps (Wikipedia).
- 2003A government survey finds that the covers have failed (Wikipedia).
- 2010Mudd and Patterson publish their critical evaluation of monitoring and rehabilitation.
Remediation
- 1983cappingReshaping of the waste rock dumps and covering with clay and soil to limit infiltration and erosion (1983–1984); neutralisation of the tailings.
- 1990cappingSupplementary works on the Rum Jungle Creek South waste dumps (Wikipedia).
From the literature
Species that acted on one of this site's contaminants in at least one study. The list is automatic and takes no account of this site's soil, concentrations or climate.
Plants
- Berkheya coddiiBerkheya coddiiEvidence: field
- Helianthus annuusSunflowerUraniumEvidence: field
- Populus albaWhite poplarEvidence: field
- Agrostis capillarisCommon bentEvidence: field
- Arabidopsis halleriHaller's rockcressEvidence: field
- Festuca rubraRed fescueEvidence: field
Fungi
- Rhizophagus irregularisUraniumEvidence: greenhouse
- Funneliformis mosseaeUraniumEvidence: greenhouse
- Pisolithus albusEvidence: greenhouse
- Aspergillus nigerBlack mouldEvidence: laboratory
- Suillus luteusSlippery jackEvidence: laboratory
- Fomitopsis pinicolaRed-belted conkEvidence: laboratory
The rest are on the contaminant pages.
Sources
- Mudd G.M., Patterson J. Continuing pollution from the Rum Jungle U-Cu project: a critical evaluation of environmental monitoring and rehabilitation, Environmental Pollution, 2010
- Jeffree R.A., Twining J.R., Thomson J. Recovery of fish communities in the Finniss River, northern Australia, following remediation of the Rum Jungle uranium/copper mine site, Environmental Science & Technology, 2001
- Harries J.R., Ritchie A.I. The effect of rehabilitation on the rate of oxidation of pyrite in a mine waste rock dump, Environmental Geochemistry and Health, 1987
- Jeffree R.A., Markich S.J., Twining J.R. Diminished metal accumulation in riverine fishes exposed to acid mine drainage over five decades, PLoS ONE, 2014
- Rum Jungle, Northern Territory, Wikipedia, 2026