Former Ilva/Italsider steelworks and Eternit plant in western Naples, on the Gulf of Pozzuoli, closed in 1990-1991. Soils hold PAHs, heavy hydrocarbons, PCBs and metals; the seabed in front is contaminated too.

Phytoremediation

At a glance

Area
249 ha on land, 1,453 ha in water1
Activity
1905–1991
Media
soil, groundwater, sediment
Kind of site
steel, asbestos, port
  1. Area. About 249 hectares on land and 1,453 at sea (MASE fact sheet, 2021; perimeter of the decree of 8 August 2014).

Contaminants

Status

Remediation under way

Remediation and urban regeneration are entrusted to a Government Special Commissioner, with Invitalia as implementing body. The Programme Agreement of 3 March 2020 allocates 387,237,826 euro (MASE fact sheet, 2021). No up-to-date official percentage of remediated area was found.

Story

The first industrial activity at Bagnoli dates from 1853; the turning point came in 1905, when construction of the Ilva steelworks began. In 1936-1938 the Eternit plant was built next to it. Between 1986 and 1990 production was scaled down: Eternit was closed, Ilva's hot area shut in 1990 and in 1991 the works ceased all activity.

In topsoil the most widespread exceedances are for zinc, lead and tin and, to a lesser extent, arsenic, mercury and copper; among organics, PAHs, heavy hydrocarbons and PCBs occur across the whole site. Deep soil shows a similar picture, with chromium, copper, zinc and lead. Groundwater holds PAHs, hydrocarbons, iron, manganese and occasionally nickel.

The site has been a SIN since 2000 (law 388/2000); its perimeter was set in 2001 and again in 2014. A new Special Commissioner has been in office since 2018; in 2020 a Programme Agreement allocated about 387 million euro for containment, remediation and urban redevelopment.

Timeline

  1. 1853First industrial activity in the area.
  2. 1905Construction of the Ilva steelworks begins.
  3. 1936The Eternit plant is built (1936-1938).
  4. 1990The steelworks' hot area closes.
  5. 1991The works cease all activity.
  6. 2000Law 388/2000 names Bagnoli-Coroglio a SIN.
  7. 2014New perimeter (decree of 8 August 2014).
  8. 2018A new Special Commissioner is appointed (decree of 3 October).
  9. 2020Programme Agreement worth 387 million euro (3 March).

Plants and fungi at this site

PhytoremediationField pilot

Festuca sp.

Zuzolo, Guarino, Sciarrillo and colleagues set up in-field mesocosms with soil from the site, comparing native species grown singly and in mixture and studying soil, microbiome and plant gene expression.

Outcome The mixed stand did better both in phytostabilisation efficiency and in stress tolerance. Among the species fescue performed best. The abstract does not say by how much soil concentrations fell.

From the literature

Species that acted on one of this site's contaminants in at least one study. The list is automatic and takes no account of this site's soil, concentrations or climate.

Plants

  • Medicago sativaAlfalfa, lucernePolychlorinated biphenylsPetroleum hydrocarbonsPolycyclic aromatic hydrocarbonsEvidence: field
  • Agrostis capillarisCommon bentLeadZincEvidence: field
  • Festuca rubraRed fescueLeadZincEvidence: field
  • Lolium perennePerennial ryegrassPolycyclic aromatic hydrocarbonsPetroleum hydrocarbonsEvidence: field
  • Paulownia tomentosaPrincess tree, empress treeLeadPetroleum hydrocarbonsEvidence: field
  • Populus albaWhite poplarCopperZincEvidence: field

Fungi

The rest are on the contaminant pages.

Nearby

Sources

  1. Scheda SIN Napoli Bagnoli-Coroglio (copia d'archivio), MASE, 2021